1. Download Electrical Machine Class 10 2. Download Electrical Engineering Class 9 3. Old question collection for 10EE (1) 4. Old question collection for 10EE (2) 5. TVET question collection for 10 EE (3) 6. SEE 2075 question collection (4)
The first hydro power station in Nepal was installed in 1911 AD. It had a capacity of 500 kW and was called the Pharping Hydropower Plant. Ever since, the country has established numerous hydropower plant to meet the never-ending demands of the citizens. Some of the major hydropower plants in Nepal are given below Kaligandaki Hydropower Plant, Syangja Capacity: 144,000 kW Project Owner: Nepal Electricity Authority Middle Marsyangdi Hydropower Project, Rasuwa Capacity: 70,000 kW Project Owner: Nepal Electricity Authority Marshyangdi Hydropower Plant, Tanahun Capacity: 69,000 kW Project Owner: Nepal Electricity Authority Khimti Hydropower Plant, Dolakha Capacity: 60,000 kW Project Owner: Himal Power Limited Kulekhani I Hydropower Plant, Makawanpur Capacity: 60,000 kW Project Owner: Nepal Electricity Authority Bhotekoshi Hydropower Project, Sindhupalchok Capacity: 36,000 kW Project Owner: Bhote Koshi Power Company Kulekhani II Hydro...
Thanku sir
ReplyDeleteNotes for basic eectronic and engieering drawing plz
ReplyDelete